Wednesday, November 14, 2007

November 14th Yard Update

The House from Highland Ave.

BEFORE: The Left Side of the Front Lawn


BEFORE: The Right Side of the Front Lawn


IN PROGRESS: Left Side. Bulbs Planted.
Top Soil Layed Down. Brickwork Done. Needs Mulch.
In the Shade - Azalia #1.

IN PROGRESS: Left Side. Second View from
Near the Street.


IN PROGRESS: Right Side. No bulbs.
No Top Soil. Brickwork Done. Needs Mulch.
Azalia #2 is Planted.

Front Porch Gardinia (Still Needs Mulch in Pot)


Front Porch Nandina (Needs Top Layer of Mulch)